Iraqi-Turkish Oil Pipeline Resumes Operations after 12-Year Suspension
Baghdad, November 27 (QNA) - Iraq resumed operations today along the old Iraq-Turkiye oil pipeline after a 12-year suspension, with the inauguration of the IT1 pumping station in Kirkuk Governorate, in a move aimed at enhancing crude oil transport capacity and diversifying export routes.
In a statement, the Iraqi Ministry of Oil said that Minister of Oil Basim Al Abadi inaugurated the pumping station, marking the start of oil pumping through the pipeline towards the IT1A station and onward to the metering station (MS) along the old 46-inch pipeline route.
The statement added that the pipeline's export capacity would reach 300,000 barrels per day in its first phase, rising to 500,000 barrels per day following the completion of rehabilitation work on the second pumping station. (QNA)
English
Français
Deutsch
Español
русский
हिंदी
اردو